Category: Legal Due Diligence

  • Pasalo of a Contract to Sell: Must the Developer Consent?

    Pasalo of a Contract to Sell: Must the Developer Consent?

    “[S]uch owner or dealer… shall not, however, be authorized to sell any subdivision lot or condominium unit in the registered project unless he shall have first obtained a license to sell the project…”

    Section 5, Presidential Decree No. 957
    Real estate advisor discussing property documents with a couple beside a high-rise building model

    By Realttorney®

    A pasalo of a condo unit or a house and lot under a contract to sell is safest when the developer approves the new buyer in writing. I found no Supreme Court decision that forces a developer to accept the assignee. Meanwhile, the Maceda Law lets a defaulting buyer sell or assign his rights, but it does not say whether the developer must recognize the new buyer.

    This is the second article in my pasalo series. The Pasalo Guide covered a titled property under a bank mortgage. Here there is no mortgage yet, and the developer, not a bank, is the creditor. The legal points were last verified on November 19, 2026.

    What is The Equity Trap?

    The Equity Trap is my name for a pattern I see in condominium unit or house and lot purchases. A buyer signs a contract to sell and pays small monthly installments toward the down payment for several years. When the balance falls due, the buyer cannot qualify for the bank loan. Rather than lose everything, the buyer sells his “equity” to someone else. That sale is the pasalo.

    This is my observation from practice, not a finding of any court or agency.

    What must a developer have before it can sell?

    A developer must first have a License to Sell. Section 5 of Presidential Decree No. 957 provides that the owner or developer shall not be authorized to sell any subdivision lot or condominium unit in a registered project unless it has first obtained a license to sell. The Decree defines “sale” broadly: it includes contracts to sell and offers to sell (Section 2(b)).

    The housing regulator has said the same. In 2012, the HLURB (now the DHSUD) reminded developers that they may not sell units without a License to Sell. Before anyone buys or takes over a unit, ask for the project’s License to Sell and certificate of registration.

    How is this pasalo different from a bank-mortgage pasalo?

    In a contract to sell, the developer keeps the title until the buyer finishes paying. The buyer owes the developer the price in installments. The buyer does not yet own the unit or the house and lot, and there is no mortgage to foreclose.

    So the question is different. It is not whether the bank will recognize the new borrower. It is whether the real estate developer will recognize the new buyer. The same rule applies. Article 1293 of the Civil Code allows a new debtor to replace the original one, but never without the creditor’s consent. Land Bank v. Ong (G.R. No. 190755, November 24, 2010) applied it to a bank, and Servicewide Specialists v. Court of Appeals (G.R. No. 116363, December 10, 1999) did too.

    Meanwhile, Republic Act No. 6552 protects buyers of real estate on installment, including residential condominium units and house and lots. It excludes industrial lots, commercial buildings, and certain sales to tenants.

    • Two years or more paid (Section 3). The buyer gets a grace period of one month for every year of installments paid, usable once every five years. If the contract is cancelled, the buyer gets a cash surrender value of 50% of the total payments, plus 5% for each year after five years, up to 90%. Cancellation takes effect only after a notarial notice and full payment of that value.
    • Less than two years paid (Section 4). The grace period is at least 60 days. The seller may cancel only 30 days after the buyer receives a notarial notice of cancellation.
    • Selling or assigning (Section 5). The buyer may sell or assign his rights to another person, or reinstate the contract, during the grace period and before actual cancellation. The deed of sale or assignment must be made by notarial act.
    • Void stipulations (Section 7). Stipulations contrary to Sections 3, 4, 5, and 6 are void.

    Does the developer have to consent to the new buyer?

    I found no Supreme Court decision that answers this directly. There are two readings, and both are my interpretation.

    First, Article 1293 points to consent. The new buyer takes over the old buyer’s duty to pay. That is a substitution of debtor, and the creditor, the developer, must agree. Contracts often say so. In Manuel Uy & Sons v. Valbueco (G.R. No. 179594, September 11, 2013), the contracts barred either party from transferring its rights without written permission. No assignment happened in that case, so it shows only that such clauses exist.

    Second, Section 5 gives the defaulting buyer a statutory right to assign, and Section 7 voids stipulations contrary to it. A clause that flatly forbids assignment may be open to challenge. A clause that only requires the developer’s approval is harder to attack. I found no decision settling this.

    My practice recommendation: treat the developer’s written approval as necessary. Until you have it, the old buyer remains the developer’s debtor.

    What if the real estate developer refuses or cancels?

    A developer that wants to cancel for default must follow the Maceda Law. In Orbe v. Filinvest Land (G.R. No. 208185, September 6, 2017), the Court held that a cancellation under Section 4 is ineffectual unless it is made by a valid notarial act. The notice there was sworn, not acknowledged, so the contract “remains valid and subsisting.” In Noynay v. Citihomes (G.R. No. 204160, September 22, 2014), the cancellation was invalid because the seller had not paid the cash surrender value required by Section 3(b).

    These cases protect the buyer’s contract until a valid cancellation. I found no decision on whether a new buyer inherits the old buyer’s years of payments for Maceda purposes. Ask the developer to state in writing how the account will be treated. This is what I advised a recent client who was in the same predicament.

    Who carries which risk in an informal pasalo?

    PartyPosition without the developer’s consentMain risk
    Old buyerStill the developer’s debtor (Article 1293)Remains liable for the installments
    New buyerHolds a promise from the old buyer, not a contract with the developerMay pay “equity” and not be recognized
    DeveloperCreditor; may approve or refuse the new buyerMust follow the Maceda Law and PD 957 if it cancels

    What should buyers, assignees, and brokers do before paying?

    These are my practice recommendations, not statutory requirements.

    1. Ask the developer for the project’s License to Sell and confirm it with the DHSUD Regional Office having jurisdiction over the location of the real estate project.
    2. Get a statement of account: total price, payments made, months paid, and due dates. This shows whether Section 3 or Section 4 applies.
    3. Read the contract’s transfer or assignment clause.
    4. Apply for the real estate developer’s written consent before paying any “equity.”
    5. Sign a notarized deed of assignment, as Section 5 requires, expressly subject to that consent.
    6. Brokers and salespersons should not list or arrange a pasalo unless the developer’s approval is part of the plan, and should state plainly what remains unverified.

    Taxes and transfer fees depend on the deal. Confirm them with the BIR and the developer before you agree on who pays. This article does not cover them.

    FREQUENTLY ASKED QUESTIONS

    Is a pasalo of a condo unit or house and lot under a contract to sell legal?

    Section 5 of the Maceda Law recognizes a covered buyer’s right to sell or assign his rights during the grace period and before actual cancellation. Outside that setting, the contract and Article 1293 govern.

    Does the developer have to accept the new buyer?

    I found no Supreme Court decision that says so. Under Article 1293, taking over the old buyer’s debt needs the creditor’s consent. Contracts often require written approval as well.

    Is a notarized deed of assignment enough?

    It documents the agreement between the old and new buyers, and Section 5 requires it to be notarized. But remember, it does not by itself bind the real estate developer.

    Can the developer cancel after I pay the old buyer?

    Only by following the Maceda Law. A cancellation without a valid notarial notice is ineffectual (Orbe), and one without payment of the cash surrender value, where Section 3 applies, is invalid (Noynay).

    Does the new buyer keep the old buyer’s years of payments?

    I found no decision on this. Ask the developer to confirm in writing how it will credit the payments already made. In my view, there is no harm in arguing that you (as the new buyer) benefit from the old buyer’s accumulated payments since the start of the contract. Why? Because you are literally stepping into the shoes of the old buyer.


    This article is general information, not legal advice on your transaction. Have a lawyer review the contract to sell and your statement of account before you sign.

    About the Author

    Atty. Jojo Perez is a real estate and estate planning attorney, a licensed real estate broker, and a PRC‑accredited lecturer and speaker on real estate topics. Through Realttorney®, he helps property owners, borrowers, and real estate professionals understand the legal principles and practical considerations involved in property ownership, foreclosure, and real estate transactions in the Philippines.

  • How Do You Restart a Stalled Subdivision Project in the Philippines?

    How Do You Restart a Stalled Subdivision Project in the Philippines?

    “For which of you, desiring to build a tower, does not first sit down and count the cost, whether he has enough to complete it?”

    Luke 14:28, The Holy Bible, Revised Standard Version, Second Catholic Edition
    Two professionals review a subdivision plan beside a weathered paved road, with tall grass, mature trees, and an unfinished structure in the background.

    By Realttorney®

    How do you restart a stalled residential subdivision in the Philippines? Follow a specific process. First, verify the approved plan and current permit status. Second, inspect what was already built, and third, reconcile every buyer account. Finally, price the remaining roads, drainage, utilities and turnover work.

    Use those findings to decide whether to finish the original project, seek approval for a redesign, bring in an equity partner, borrow to finish the development, or sell the project on an “as-is-where-is” basis.

    The subdivision project had a development permit, an environmental clearance and a License to Sell. Buyers began paying. But sales came in more slowly than expected, development proceeded in fits and starts, and the completion date came and went.

    Years later, the owner-developer is at a crossroads. There were previous attempts to revive the project to no avail. Where does he begin? The options are there. But in today’s economy, there is little point in negotiating interest rates or an investor’s share while the number of lots you can sell remains in doubt.

    Consider an anonymized example from a socialized, lots-only subdivision. Sales fell short of the cash needed for development, and the developer returned purchasers’ money. The paved main road reached the property boundary, with some drainage alongside it. Vegetation had grown over the traced roads, and no utilities were in place. The original completion period passed without an extension. The owner-developer later considered building houses on the lots. Before pricing that proposal, the developer needed to know what existing work could be reused and which approvals a different product would require.

    1. What has actually been built?

    Start with the plan on file and an independent site inspection. Mark what was approved, what is in place, and what remains usable. A subdivided site with survey monuments and a rough road is in a different position from a project with passable roads, working drainage and an assured source of water.

    What you findWhat you need to establish
    Raw land, staking or clearingWhether approved boundaries, lawful access, drainage outlets and utility connections are still feasible.
    Partly built roads, drains or utilitiesWhat was actually built, whether it meets the approved design, what has deteriorated, and which works must be repaired or replaced.
    Near-complete or partly occupied subdivisionWhich areas are safe and serviceable, what still prevents lawful turnover, and how essential services will be maintained during work.

    A civil engineer can price the remaining works and a geodetic engineer can reconcile the ground with the approved plan and titles. The site visit should include the road from the nearest public street, the legal right to use it, the point where stormwater will discharge and the connections to off-site utilities. A paved interior road has limited value if emergency vehicles cannot reach it or if the drainage system has nowhere lawful to discharge.

    Ask for a signed estimate and work schedule. Separate useful existing work from rework, off-site improvements, testing and commissioning. A completion percentage of the remaining work to be done is meaningful only if you know what it truly measures.

    2. Which permits and approvals govern the restart?

    Ask the city or municipality for the status of the development permit and approved subdivision plan. Ask the DENR Environmental Management Bureau about the Environmental Compliance Certificate (ECC), its conditions and any monitoring or changes required. Ask the DHSUD regional office for the Certificate of Registration and License to Sell (LTS), any amendments or extensions, and any orders affecting the project. For older projects, the DHSUD file may include approvals issued by the former HLURB.

    Read each approval for what it covers. Under Section 20 of Pres. Decree No. 957, development of the entire project is generally done within one year after the LTS was issued or within an extension period fixed by the regulator. A missed completion date calls for a review of the project’s regulatory status, including extensions, restrictions, the performance bond and any enforcement orders. Ask DHSUD what work, marketing, reservations, sales and collections it permits today, and what requires approval first. A development permit, an ECC and an LTS answer different questions. [PD 957, Sections 4–6 and 20 · DHSUD Department Circular 2024-005]

    An application for more development time may require a revised work program with professional certification, cost and financing details, written notice to buyers and, in appropriate cases, additional security. For the ECC, establish when actual implementation took place and whether the new plan or a change of developer requires a different environmental approval. EMB Memorandum Circular 2020-31 provides a five-year guidance over non-implementation of development projects. Hence, collect and secure dated evidence of site works to establish a baseline on what matters and plan how to restart the project. [See also Revised PD 957 implementing rules, Section 21].

    3. What happens to buyers who already paid?

    Build a buyer ledger before putting any lot back on the market. For each lot, match reservations, contracts, official receipts, bank records, refunds, cancellation or settlement documents, possession, financing and title annotations. A purchaser who received a refund may still appear in the developer’s inventory or in the title records. Resolve that discrepancy before offering the lot to anyone else.

    Sort buyer accounts by the facts. When a qualifying installment buyer gives due notice and stops paying because the developer failed to develop according to the approved plans within the applicable period, Section 23 of Pres. Decree No. 957 can protect the payments from forfeiture. The Supreme Court recognizes that the buyer may keep the contract and suspend payments pending completion or seek cancellation and reimbursement under the law. Where the buyer stopped paying for a different reason, Section 24 directs the analysis to the Maceda Law where applicable. Grace periods, notices and refund rules then depend on the account history. [PD 957, Sections 23–25 · G.G. Sportswear v. World Class Properties · RA 6552]

    If buyers are still waiting, tell them what has been verified, the next milestone and when they can expect another update. Provide a way to reconcile accounts. For a bank-financed account, identify the loan and the lender’s claim before offering a switch, refund or new payment schedule. A financing institution is a necessary party to a Section 23 claim where the purchase price was paid through a housing loan. The Human Settlements Adjudication Commission has jurisdiction over specified buyer claims, including refund and specific performance. [RA 11201, Section 16]

    4. Can you change a lots-only project to house-and-lot?

    A lots-only approval covers the product shown in the approved documents. Before offering houses, ask the LGU and DHSUD what changes to the plans, development permit and registration or license are required. The DHSUD–DEPDev circular issued in December 2025 set socialized subdivision house-and-lot ceilings of ₱844,440 or ₱950,000 depending on floor area. For example, a newly planned ₱3 million house and lot package exceeds both ceilings. Lots only are capped at 40% of the equivalent package price and must meet the applicable single-detached lot specification. For a legacy project, confirm with DHSUD which standard and price apply and what licensing action is available. [DHSUD–DEPDev Joint Memorandum Circular 2025-001 · DHSUD Department Circular 2024-005]

    Put both concepts on the same drawing. On a typical six-meter frontage, what house type fits after setbacks? Can the approved roads, open spaces and drainage serve the revised plan? Would some lots need to be combined? Could a smaller first phase be serviced independently, consistent with the approved plan and commitments to buyers? A higher selling price per home can still reduce the project’s value if the redesign sharply reduces the number of saleable lots or adds expensive infrastructure.

    If you change roads, open spaces or other protected features of the approved plan, check Section 22 of Pres. Decree No. 957 for regulatory approval and applicable written conformity. Also confirm whether the new category triggers balanced housing compliance and how any project-specific conditions carry over. [PD 957, Sections 19–22 · BP 220 revised standards · RA 10884]

    5. Should you bring in an investor, borrow, or sell?

    Price the remaining development, rework, approvals, utilities, refunds, title releases, taxes, financing and contingency. Then schedule the cash month by month. A project can show a profit on paper and still run out of money long before the first batch of buyers takes possession.

    OptionWhat it buys youWhat to negotiate
    Developer-investor joint venture or equityCapital that shares project risk and, with an experienced partner, a team that can finish it. You share control and future profits.The value of land and existing works, actual capital commitments, responsibility for overruns, milestone disbursements, decision rights and what happens if approvals fall through.
    Development loanFunding while you retain ownership and the project’s upside. Repayment and interest remain due according to the agreement, including when sales disappoint.Drawdown schedule, repayment period, contingency, collateral, partial lot releases, limits on personal guarantees and a credible way to repay under slower sales.
    Outright saleCash at closing if a qualified buyer can perform. The buyer takes future development upside and the parties negotiate which obligations each will bear.What is actually sold, conditions to closing, regulator action, claims the buyer assumes, approvals, taxes, payment security and any amount held back for unresolved liabilities.

    For a mortgage over lots covered by Pres. Decree No. 957, Section 18 requires prior written regulatory approval. It also addresses use of proceeds for development and buyer notice before loan release. For a transfer of an approved project, verify the regulator’s requirements, including an undertaking by the transferee to assume responsibility for completion where applicable. Have the land and improvements valued independently, and compare what each route leaves you after taxes, releases and obligations. [PD 957, Sections 17–18 and 25 · Revised PD 957 implementing rules, Section 22 · BIR Revenue Regulations 7-2003]

    6. What should you verify before signing a deal?

    Before signing a financing or sale agreement, ask for five pieces of evidence:

    1. Current titles, legal access and a verified schedule of available lots.
    2. The regulator’s written position on the proposed product and approval path.
    3. A buyer ledger with evidence of how active and refunded accounts will be handled.
    4. A signed cost-to-complete estimate, funded cash flow and a schedule that allows for setbacks.
    5. A plan for inspections, utility commissioning, completion approvals and title delivery.

    If those documents support the original plan, completion may be the simplest course. If the project is viable but the owners want help carrying risk and managing development, an equity partner may fit. If debt service depends on a rapid relaunch and brisk presales, reconsider the financing. If neither plan raises enough capital on reasonable terms, a well-structured sale may give the project its best chance of being completed.

    Sometimes the first thing worth financing is the work needed to establish what the project can still deliver. Once that is clear, the developer and the people waiting for their lots can judge the same plan on the same evidence.

    FREQUENTLY ASKED QUESTIONS

    Can a developer resume selling under an old License to Sell?

    Ask the DHSUD regional office to confirm the current status of the license, the approved inventory, and any restrictions before offering lots, taking reservations, or collecting payments. If the development deadline passed, ask which filing or corrective steps apply to the project. [PD 957, Sections 2, 5 and 20]

    Can a developer restart only one phase?

    Ask the LGU and DHSUD whether the proposed phase can proceed under the approved plan or needs an amendment. It is important to show how the restart of the project can operate safely with legally available access, functioning drainage, water and other essential services, and how existing commitments to buyers will be met. PD 957, Sections 20 and 22 · DHSUD Department Circular 2024-005

    For the buyer’s perspective, read this article: Before You Pay: 5 Property Due Diligence Checks in the Philippines.


    This article provides general information. A specific project requires review of its permits, titles, buyer records and agreements.

    About the Author

    Atty. Jojo Perez is a Philippine real estate and estate planning attorney, a licensed real estate broker, and a PRC-accredited lecturer on real estate topics. He writes about property due diligence and transactions at Realttorney®.

  • Before You Pay: 5 Property Due Diligence Checks in the Philippines

    Before You Pay: 5 Property Due Diligence Checks in the Philippines

    “Risk comes from not knowing what you’re doing.”

    – Warren Buffett, World’s greatest investor

    A person reviewing documents while holding a pen, with a magnifying glass and a miniature house model on the table.

    By Atty. Jojo | Realttorney®

    What should I check before paying a reservation fee or down payment on a property in the Philippines?

    Before paying a reservation fee or down payment on a property in the Philippines, independently verify five things: the title and its annotations; the seller’s identity and authority; the rights of occupants; the property’s boundaries and lawful access; and the written payment and turnover terms. For a developer project, also verify the applicable License to Sell.

    A beautiful property deserves more than a quick look at a photocopied land title from the owner or attorney-in-fact.

    Perhaps you have found a house with enough space for the children, a condominium near work, or a lot in Cavite where you can finally build that retirement home. You have already imagined the garden. Your spouse has started planning the kitchen.

    Then someone says, “May ibang interested buyer. Reserve it today.”

    Oh my! When you hear that marketing or sales script creating a sense of urgency, that’s exactly when you should slow down.

    Before committing money, I recommend checking five things: (1) the land title and its annotations; (2) the seller’s identity and authority; (3) the people occupying the property; (4) its access and boundaries; and (5) the written terms for payment and turnover.

    The purpose is straightforward: find out whether the property deserves your money before your money becomes part of the problem.

    What is initial property due diligence?

    Initial property due diligence is the buyer’s preliminary investigation of a property’s ownership, seller, physical condition, occupation, access, and proposed sale terms before making a financial commitment.

    Think of it as the first screening. It helps you decide whether to proceed, require additional documents, negotiate safeguards, or walk away. It does not replace the detailed legal, technical, and financial review that a particular transaction may require.

    Here is how I suggest buyers approach it.

    1. Verify the title and read every annotation

    Obtain a recent certified electronic copy of the Torrens title independently, then have the entire document reviewed.

    For titled property, request the appropriate Original Certificate of Title, Transfer Certificate of Title, or Condominium Certificate of Title. The Land Registration Authority’s official guidance identifies the Registry of Deeds and the LRA eSerbisyo portal as channels for requesting certified copies.

    The seller’s photocopy is useful for identifying the land title to request. It should not be your only basis for proceeding.

    Compare the registered owner’s name, title number, lot details, location, and area with the property being offered. Read all pages, including the annotations. Ask your attorney to explain any mortgage, adverse claim, notice of pending litigation, restriction, or other entry.

    Do not accept “fully paid na ang loan” as the end of a mortgage inquiry. Ask for verification from the lender and a documented arrangement for the release and cancellation of the mortgage before proceeding.

    If the seller presents only a tax declaration, stop treating the transaction as an ordinary purchase of titled land. As explained in my guide for overseas property buyers, a tax declaration does not, by itself, prove ownership. Untitled land requires a different investigation.

    My practical recommendation is to refresh the title check near closing. A copy obtained early in negotiations should not be treated as a permanent statement of the real estate’s status.

    A title check starts the investigation. It does not finish it.

    2. Confirm the seller’s identity and authority

    Verify both who the seller is and what that person is legally authorized to sell. Oftentimes, the seller is not the registered owner.

    Ask to examine reliable government-issued identification and compare the details with the title and supporting records. Resolve differences in names or civil status through proper documents.

    Where possible, communicate directly with the registered owner through independently verified contact details. Someone’s familiarity with the property, possession of its keys, or relationship with the owner is not enough for me to recommend releasing money.

    If a representative will sign, have the authority examined carefully. Articles 1874 and 1878 of the Civil Code require written authority for an agent’s sale of land and special authority for transactions conveying ownership of immovable property.

    Ask whether the authority covers the particular property, signing the proposed document, and receiving payment. Independently verify the instrument and whether the authority remains effective.

    Certain situations deserve closer attention:

    • A deceased registered owner: Ask for the documents identifying the heirs and establishing the lawful settlement and sale arrangements.
    • A corporate seller: Request the corporate records and approvals supporting the transaction and the signatory’s authority.
    • A married seller: Have counsel determine the property regime and any required spousal participation or consent.
    • Several co-owners: Establish exactly whose interests are being sold.

    Under Article 493 of the Civil Code, a co-owner can dispose of an undivided interest; this does not automatically authorize the sale of everyone else’s shares.

    My article, “How to Sell the Property of a Dead Relative,” discusses why identifying the heirs and their authority matters. Its estate-tax-amnesty dates are historical and should not be treated as a current deadline.

    “The family has already agreed” is a reason to request the supporting documents.

    3. Find out who actually occupies the property

    Inspect the property and investigate the rights of anyone occupying or using it.

    Who lives there? Who collects rent? Who cultivates the land? Who holds the keys? Is someone using part of the property for storage or business?

    Ask whether the occupants are owners, relatives, tenants, caretakers, agricultural tenants, or people asserting an independent claim. Request the relevant agreements and compare the answers with the seller’s explanation.

    This inquiry has legal significance. In Rufloe v. Burgos, G.R. No. 143573, January 30, 2009, the Supreme Court explained that suspicious circumstances require further investigation. Where someone other than the seller possesses the property, a buyer should inquire into that person’s rights. Failure to investigate can defeat a claim of good faith.

    Consider this hypothetical example: the seller promises that a caretaker will leave immediately after payment. During your visit, the occupant says the family has lived there for twenty years and claims ownership.

    You now have conflicting information that requires further and in-depth investigation before payment.

    If vacant, possession is essential, require a clear contractual arrangement stating who must deliver it, when, and what happens if the obligation is not fulfilled. Have counsel assess the occupant’s rights and whether the proposed arrangement is realistic.

    The ability to obtain a title in your name and the ability to move into the property deserve separate attention.

    4. Check access, boundaries, and your intended use

    Confirm that the property shown to you matches the documents and has legally established access.

    A fence is a useful physical marker, but I would not rely on it to establish the legal boundary. For a lot purchase, particularly raw land or a proposed portion of a larger property, engage a licensed geodetic engineer when necessary to verify the location and boundaries against the technical records.

    Ask the seller to identify the corners, adjoining properties, and route to the public road. Then examine the supporting plans and access documents.

    Be especially careful when the explanation is, “Dito naman dumadaan ang lahat.”

    A route used with a neighbor’s permission needs investigation. Under Articles 649 and 650 of the Civil Code, a compulsory right of way is subject to legal conditions, including rules on indemnity and location. Do not budget on the assumption that access will be easy to obtain later. The worst case scenario is that you need to file a complaint for right of way in the proper trial court.

    Also ask whether the property suits your intended use. Before buying land for a home, farm, rental project, or resort, request relevant zoning information, restrictions, and available hazard information from the appropriate offices.

    For agricultural land, seek specific advice on agrarian reform coverage, tenancy, transfer restrictions, and conversion requirements.

    A cool breeze and a lovely view in Metro Tagaytay can make a compelling sales presentation. They should also prompt practical questions about slope, drainage, access, and building feasibility.

    For a house or condominium, arrange an appropriate physical inspection. Legal review cannot tell you whether the roof leaks or the electrical installation needs repair.

    5. Read the payment and turnover terms before paying

    Agree in writing on what you are paying for, what must happen first, and what happens if the transaction fails.

    A reservation payment may feel like a small first step. Read the document governing it before treating it as harmless.

    Ask:

    • Is the payment refundable, and under what conditions?
    • What documents must the seller provide, and by when?
    • What happens if verification reveals a material problem?
    • When does the balance become payable?
    • Who pays what taxes, fees, arrears, and the transfer as well as registration of ownership documents to the new owner?
    • When will possession and the required documents be delivered?

    Have your attorney distinguish a reservation arrangement, earnest money, an option, and a down payment. Article 1482 of the Civil Code treats earnest money given in a contract of sale as part of the price and evidence of the contract’s perfection. The document and circumstances require careful review.

    Request current real property tax records and receipts, statements of account for association dues, special assessments, and relevant utilities. Ask how outstanding obligations, if any, will be settled and documented.

    My article on HOA dues left unpaid by a previous owner raises a useful due diligence question: what obligations are you potentially inheriting with the property? Have the current governing documents and applicable rules reviewed rather than assuming that all arrears automatically become your responsibility.

    Where a mortgage must be settled from the purchase price, require a coordinated closing arrangement with the lender. Verify payment instructions independently, especially if someone suddenly changes the receiving bank account.

    Buying from a developer? Verify the project’s authority to sell

    For a real estate developer’s subdivision or condominium project offering, include the project’s registration and applicable License to Sell in your initial checks.

    Section 5 of Presidential Decree No. 957 requires a License to Sell for covered project sales. Section 7 provides exemptions for specified transactions, so the requirement should not be indiscriminately applied to every resale.

    Ask DHSUD to verify the license and its coverage for the particular phase, tower, or inventory being offered. A familiar developer’s name is not a substitute for checking the particular project.

    Review the approved plans, promised completion and turnover, and proposed contract as well.

    For overseas Filipinos: arrange verification on the ground

    A video tour can show you the balcony. But it cannot complete the investigation of the seller’s authority, an occupant’s claim, or a boundary discrepancy.

    Arrange an independent on-site inspection and obtain documents through reliable channels. Give your representative a written checklist and ask for a report that identifies unresolved questions alongside photographs and findings.

    A trusted relative can help coordinate the entire process of legal due diligence. For legal and technical questions, engage the appropriate professionals.

    My overseas buyer’s guide provides related background. Any citizenship, ownership, or transaction requirements should be checked against the buyer’s present circumstances and current law.

    Before your next viewing

    Save these five questions:

    1. Have I independently checked the land title and its annotations?
    2. Have I verified the seller’s identity and authority?
    3. Do I know who occupies the property and on what basis?
    4. Have I checked boundaries, lawful access, and suitability?
    5. Do the written payment and turnover terms address unresolved risks?

    You do not need to become a real estate attorney or land surveyor before buying property. You do need to recognize when a reassuring answer requires proof.

    A seller’s willingness to provide documents and allow reasonable verification helps you evaluate the transaction. Refusal, inconsistent explanations, or pressure to pay should prompt an immediate pause and closer examination.

    Before committing your savings, let the documents, the people, and the property tell a consistent story.

    If you need help evaluating a property, book a consultation with Realttorney® before making your financial commitment.


    This article provides general information on initial property due diligence in the Philippines. The extent of investigation and legal advice required depend on the property and transaction.

    About the Author

    Atty. Jojo Perez is a real estate and estate planning attorney, a licensed real estate broker, and a PRC‑accredited lecturer and speaker on real estate topics. Through Realttorney®, he helps property owners, borrowers, and real estate professionals understand the legal principles and practical considerations involved in property ownership, foreclosure, and real estate transactions in the Philippines.